Project GYD Anti Glare Commercial Downlight
The Project GYD Anti Glare Commercial Downlight is designed for hospitality and commercial environments where strict glare control and visual comfort are essential. Featuring advanced anti-glare optics and high-CRI performance, it delivers controlled, comfortable illumination suitable for hotels, premium retail and professional commercial interiors.
With multiple sizes, wattages and interchangeable lens options available, Project GYD allows a single luminaire family to support different ceiling heights, zones and lighting requirements across an entire project. This flexibility makes it an ideal solution for large-scale commercial and hotel lighting designs requiring consistency, precision and visual comfort.
- Customisable
- Worldwide shipping
- Secure Payment
TYPE: Ceiling recessed
Light Source: 20W / 30W dedicated phosphor LED, non-replaceable
Colour Temperature / CRI: 2700K, 3000K, 4000K, 5000K, CRI 95
Optic: 24°, 45°
Body: Die-cast aluminium adjustable housing with powder-coated finish, polycarbonate optic, steel spring mounting clips
Dimmable: TRIAC dimming standard; 1–10V and DALI dimmable upon request
Finish: White
Lumen Package: 90 lm per watt
Bezel Diameter:
20W (Trimmed): Ø135 mm
30W (Trimmed): Ø180 mm
Cut Out:
20W (Trimmed): Ø125 mm
30W (Trimmed): Ø170 mm
Depth:
20W: 110 mm
30W: 120 mm installation depth required
IP Rating: IP54
Weight: 2 kg (excluding driver)
Adjustability: Fixed
Driver: Remote driver with plug
Lead Time & Delivery
Our products are made or prepared to order to ensure quality and precision.
Lead times vary depending on stock availability, production schedule, and delivery location.
In-Stock Items
- Melbourne Metro: 1–2 business days
- Other Australian locations: 2–5 business days
- Remote areas (including Hobart & Cairns): 5–7 business days
Made-to-Order / Backordered Items
- Standard production & delivery: 8–12 weeks
- Airfreight option available: 4–5 weeks (additional cost may apply)
International Shipping
All international orders are built to meet local electrical standards.
- Air Freight: approx. 3–4 weeks (production + air transit)
- Sea Freight: approx. 8–12 weeks (production + sea transit)
For urgent or time-sensitive projects, please contact our team at sales@lucretia.com.au before placing your order.