Lucretia 2020 facade lighting Neon Flex
Our 2020 Neon Flex is the most eye-catching, and versatile product used for modern façade lighting.
The 2020 LED Neon Flex will highlight architectural lines and create a statement on any exterior.
This Product is rated IP68, it is completely weatherproof and perfect for outdoor use.
Easy to install and available in a variety of lengths. Use the 2020 Neon Flex to transform your space!
- Customisable
- Free worldwide shipping
- Secure Payment
<p><strong>TYPE:</strong>20mm x 20mm Neon LED Flex<br><strong>Light Source:</strong>10W Per meters or custom wattage<br><strong>Voltage:</strong>DC24V<br><strong>Code: </strong>LUS2835-WH120-24V-2020MM<br><strong>Colour Temperature/CRI:</strong>2200K-5000K<br><strong>Working Mode:</strong>Constant Voltage or Constant Current<br><strong>Beam Angle:</strong>160Degrees<br><strong>Height:</strong>20mm<br><strong>Width</strong>:20mm<br><strong>Material:</strong>PVC<br><strong>Colours:</strong>Warm white, CoolWhite /Red /Green /Blue /Amber /Pink /Purple. RGB<br><strong>CRI /SDCM:</strong>Ra≥80, SDCM<5; Ra≥90, SDCM<3 (custom-made)<br><strong>Bending Direction:</strong>Horizontal Bending<br><strong>Bending Diameter:</strong>10cm<br><strong>Lumen Package</strong>:3000K, 400lm per meters<br><strong>IP:</strong>67<br><strong>Dimmable:</strong>Non-dimmable ,TRIAC Dimming,1-10V and Dali dimmable Upon Request only</p>
Lead Time & Delivery
Our products are made or prepared to order to ensure quality and precision.
Lead times vary depending on stock availability, production schedule, and delivery location.
In-Stock Items
- Melbourne Metro: 1–2 business days
- Other Australian locations: 2–5 business days
- Remote areas (including Hobart & Cairns): 5–7 business days
Made-to-Order / Backordered Items
- Standard production & delivery: 8–12 weeks
- Airfreight option available: 4–5 weeks (additional cost may apply)
International Shipping
All international orders are built to meet local electrical standards.
- Air Freight: approx. 3–4 weeks (production + air transit)
- Sea Freight: approx. 8–12 weeks (production + sea transit)
For urgent or time-sensitive projects, please contact our team at sales@lucretia.com.au before placing your order.